Overview
Experience: 10 – 16 Years
Work Location: Dubai – United Arab Emirates
Schooling: Expert of Technology/Engineering(Mechanical)
Identity: Any Nationality
Orientation: Any
Opening: 1 Vacancy
Expected set of responsibilities
Senior Project Engineer with broad involvement with Marine, FSPO, FSRU transformation designing and development. The experience should cover fundamental plan, detail plan, development designing, reconciliation designing, and acquirement for the full transformation as EPC.
KEY RESPONSIBILITIES
Driving a multi-discipline designing group for significant transformation scope at the yard.
Full information on funneling and hardware: the premise of the plan, gear measuring, and determination for siphons, heat exchangers, blowers, motors, evaporators, valves, pressure/stream control gadgets.
Indicate gear information sheets and particulars, merchant information survey, hardware producing, processing plant acknowledgment tests, bundle designing.
Mechanical plan and estimations of apparatus spaces, gear upholds, material dealing with gadgets, establishment, and upkeep approaches.
Information on EIT mix designing.
Information on underlying designing
Experience with oil and gas and LNG frameworks.
Specialized survey of citations and contact with picked merchants.
Go about as yard designing chief on transformation projects.
Oversee and regulate designing subcontractors.
Plan designing expectations/man-hour gauge/plan for projects.
Control and screen man-hour utilization versus project accomplished advancement.
Take part in plan audits and make fundamental subsequent moves.
Carry out everyday tasks relegated for the designing division/area to guarantee consistency with the laid out norms and methodology.
Wanted Candidate Profile
Expert of Science certification in related Engineering from respectable colleges.
10-15 Years of involvement with related fields remembering work for designing organizations and EPC project workers.
About Dry Docks World - Dubai (LLC)
DRYDOCKS WORLD - DUBAI is an advanced boat fix and new structure yard with extremely huge dry harbors and broad boat building offices. The organization initiated tasks in 1983 and utilizes almost 10,000 worldwide workers from 52 nations.